DOF’s innovations on this very complicated project included many unique state-of-the-art design components that set new standards for sediment remediation. Among these elements were joint inspector/dredge operator evaluation of dredged material during dredging operations and real-time sampling behind the dredge.

DOF provided the following services:

  • Managed pre-design studies, assessments and pilot programs
  • Prepared project design plans (design analysis report, plans and specifications and cost estimate)
  • Prepared supporting plans (CQAP, Health and Safety Plan)
  • Coordinated shoreline and in water remediation with federal, state and local agencies
  • Prepared construction bid documents and negotiated contractor construction contract documents
  • Prepared RFI responses, reviewed submittals and managed construction meetings
  • Conducted field inspections and observations documented by daily field reports and photos
  • Prepared progress reports for EPA
  • Conducted real-time contaminated sediment sampling behind dredge
  • Conducted real-time water quality monitoring and provided online results
  • Prepared removal action completion report for EPA